FY 2022/23 Gravity Sewer Improvement Project
The project is generally described as follows: replace existing pipelines by open-cut and removal and replacement (60LF), replacing existing sanitary sewer by pipe bursting (~6,400 LF), including sawcut, excavation and backfill, shoring, replacing laterals, disconnecting and reinstating lateral connections, abandoning existing sewer pipelines and manholes, removing existing cleanouts and manholes, constructing new manholes and property line cleanouts, asphalt concrete pavement restoration, CCTV inspection, traffic control, project signs, and bypass pumping of sanitary sewer flow. All of said work is to be done in accordance with the Contract Documents as described above, at the places and in the particular locations, of the form, sizes and dimensions and of the materials, and to the lines and grades and at the elevations as shown on the Plans and Specifications made therefore and approved by the District.
Specifications
(click to expand/collapse)
Name | Size | ||
2022 GSIP - Final Specs 8.16.22 | 11.1 MB |